Articles → AZUREDEVOPS → Integrate Whitesource Bolt In Azure Devops

Integrate Whitesource Bolt In Azure Devops






Steps




  1. Add whitesource bolt from visual studio marketplace.
  2. Connect to Azure directory from organization settings.
  3. Create a new pipeline.
  4. Trigger the build.

Add Whitesource Bolt From Visual Studio Marketplace




Picture showing installation of WhiteSource Bolt from visual studio market place
Click to Enlarge



Picture showing the WhiteSource Bolt card in visual studio market place
Click to Enlarge



Picture showing the install button for installing the WhiteSource Bolt
Click to Enlarge



Picture showing the confirmation message once WhiteSource Bolt is installed
Click to Enlarge


Connect To Azure Directory From Organization Settings




Picture showing the Connect directory button for connecting the Azure DevOps with Azure Active Directory
Click to Enlarge



Picture showing the connect button for connecting to the Azure AD
Click to Enlarge



Picture showing the WhiteSource link inside the Organization settings
Click to Enlarge



Picture showing the screen to create the Whitesource Bolt Account
Click to Enlarge



Picture showing the screen that confirms that whitesource bolt account is created
Click to Enlarge


Create A New Pipeline




Picture showing the use the classic editor link for creating the new pipeline
Click to Enlarge



Picture showing a screen to select the repository type
Click to Enlarge



Picture showing a screen for selecting the template
Click to Enlarge



Picture showing the Add button for adding the WhiteSource Bolt task
Click to Enlarge



Picture showing the WhiteSource Bolt task added in the task pipeline
Click to Enlarge




Trigger The Build




Picture showing the build got triggered
Click to Enlarge



Picture showing the report in WhiteSource Bolt tab once the build is succeeded
Click to Enlarge


Posted By  -  Karan Gupta
 
Posted On  -  Wednesday, July 21, 2021

Query/Feedback


Your Email Id  
 
Subject 
 
Query/FeedbackCharacters remaining 250